Project sheet

In Construction

DOMINI SORIANO

Ref: 332

Launch 1, 2 and 3 bedrooms



DÓMINI SORIANO is in the center of the South, just a few meters away from July 18, in a privileged context, with quick access to the waterfront and with all the infrastructure of state, educational and financial services of the city of Montevideo.

Its excellent design on the facade stands out

It will consist of 57 apartments of very comfortable dimensions: 27 units of 1 bedroom, 27 units of 2 bedrooms, 2 units of 3 bedrooms, 1 penthouse unit of 2 bedrooms with barbecue for exclusive use. 15 optional garages and an accessible garage on the ground floor, 13 garages in the underground.

On the 11th floor there will be a common barbecue, table, chairs and air conditioning.
Laundry area with washing machines that will work with chips.
Solarium terraces in front of the building.

Project covered by Law 18,795 Social Housing with all tax benefits.

Terminations:
Roller blind with monoblock system in bedrooms.
Vinyl floor simile wooden board in living rooms, bedrooms and kitchens.
Installation planned for washing machine.
Hood and hob in units of 2 and 3 bedrooms.
Forecast for electric oven in units of 2 and 3 bedrooms.
Hood and electric forecast for kitchen in 1 bedroom units.
Pre-installation of air conditioning (drain and electrical forecast). AA (split) equipment will not be delivered.

1 bedroom USD 110,500
2 bedrooms from USD 153,000
3 bedrooms USD 250,000

Garages from USD16,000

Occupancy Expenses: 4.25%
September 2022 Occupation

Floors

RELATED PROJECTS

GREEN TOWER

PRE-LAUNCH, excellent for rent

Launch

QUADRA CENTRUM

Architecture and quality design hand in hand with great social benefits.

Brand New

NOSTRUM BAY BUILDING

It is located in the center and at the same time, on the rambla, with exceptional views of the port

In Construction

BUY SALE
DOLAR 36.35 38.35
EURO 40.5 43.5
REAL 8.95 9.95
PESO ARG. 0.4 0.7

Property Value Index (m2)

RECENT

DOMINI SORIANO

VIEW MORE

10 December 2019

GREEN TOWER

VIEW MORE

06 December 2019

FORUM

VIEW MORE

05 December 2019

Contact us for more information about this project

We will reply in no more than 24 hs.

ALL RIGHTS RESERVED PLAZA MAYOR ®