Project sheet

In Construction

LANCASTER

Ref: 319

Premium apartments on Plaza Cagancha



Avant-garde project of modern and comfortable apartments located on Plaza Cagancha in the downtown area on the main artery of Montevideo.

This excellent location guarantees an accessible and direct transport to all cardinal points of the capital, as well as proximity to a wide range of shops, services and entertainment.

The apartments will be characterized for being very luminous atmospheres, with ample views and pleasant proportions, facilitating the equipment of the units.


The units have:
- Boxes for each unit
- Air conditioning installed
- Utility room for common use
- Anodized glass windows with double hermetic glass
- Kitchens with countertops in quartz, furniture, countertops and overhead, forecast ceramic hob, air and smoke extraction system, provision for oven and reinstallation of washing machine.
Units of 1 bedrooms against front from USD 130,000
Units of 1 bedroom front from USD 160,000
Penthouse 2 bedrooms USD 250,000

Occupancy costs 4%
Releases September 2019

The following forms of payment apply bonuses:
5% with 50% commitment + 30% August + 20% delivery.
8% with 80% commitment + 20% delivery.
10% with 100% commitment.


RELATED PROJECTS

6
Centro, Montevideo

HORUS ART

In Construction

The building is composed of 10 levels with three units per floor with 1 and 2 bedrooms HORUS ART is located in the axis of the Bar ... [more]

6
Centro, Montevideo

01 LAS ARTES

In Construction

1 block from the Rambla, 3 blocks from the Plaza Independencia, in the heart of the Arts District, surrounded by bars, museums, theaters and ... [more]

8
Centro, Montevideo

01 DEL CENTRO

In Construction

The project was designed with quality and comfort in mind, together with its proximity to both the boulevard and the main economic centers o ... [more]

BUY SALE
DOLAR 41.4 43.9
EURO 48.5 52.5
REAL 6.7 8.4
PESO ARG. 0.15 0.45

Property Value Index (m2)

RECENT

PRANA

VIEW MORE

30 October 2020

ALQUIMIA

VIEW MORE

12 October 2020

MARINA 26 III

VIEW MORE

12 October 2020

Contact us for more information about this project

We will reply in no more than 24 hs.

ALL RIGHTS RESERVED PLAZA MAYOR ®