Project sheet

Brand New

INFINITY BUXAREO y 26

Ref: 264

Two towers, one located on Buxareo Street and the second on 26 de Marzo.



Infinity Buxareo and 26 will consist of two towers, one located on Buxareo street and the other on 26 de Marzo street. They have an exceptional location very close to the sea, and close to the World Trade Center and Montevideo Shopping Center.
The building will have ample spaces of common use: Barbecue, laundry and gym.

Spacious 1 bedroom units and multipurpose single rooms.
Each unit will be delivered with air conditioning equipment already installed.
They are buildings of 11 floors plus ground floor and subsoil; With ample units of 1 bedroom and studios suitable for housing or office.
Automatic lifts with fine cab finishings.
In the last level they will have a large hall for events, with bathrooms, kichenette, barbecue, large terraces with panoramic view. It will serve both for barbecue and solarium, as well as for corporate events room.
Room for laundry used for common use with washing machines and drying machines.
Gym with state of the art appliances.
High end finishings.
Modern facades and elegant design.
Optional garages.

Studios from USD 120,000
1 bedroom from USD 164,000

Optional garage from USD 23,500
Occupancy expenses 4%

 

RELATED PROJECTS

7
Pocitos Nuevo, Montevideo

VAYUS

In Construction

Vayus is developed on 13 levels: SS1 and SS2 basement, ground floor, ten apartment levels and a last level of amenities. There are 25 apartm ... [more]

4
Pocitos Nuevo, Montevideo

FIRST TOWER

Brand New

PREMIUM OFFICES METERS. FROM WORLD TRADE CENTER 26 de Marzo and Marco Bruto. Fully equipped conference room. ... [more]

7
Pocitos Nuevo, Montevideo

YES

Launch

Building with privileged location 100 meters from the WTC and Montevideo Shopping. Units Studio and 1 bedroom facing North with terraces. Pr ... [more]

BUY SALE
DOLAR 41.4 43.9
EURO 48.5 52.5
REAL 6.7 8.4
PESO ARG. 0.15 0.45

Property Value Index (m2)

RECENT

PRANA

VIEW MORE

30 October 2020

ALQUIMIA

VIEW MORE

12 October 2020

MARINA 26 III

VIEW MORE

12 October 2020

Contact us for more information about this project

We will reply in no more than 24 hs.

ALL RIGHTS RESERVED PLAZA MAYOR ®