Project sheet

Brand New

PROA AL SUR

Ref: 159

High End Terminations in Punta Carretas



Proa al Sur: a building to live all life
 
Large areas, one unit per floor, 4 bedrooms, 2 en suite of 250m2.
 
With pallier of exclusive use, 3 bathrooms plus toilette, large living room, service entrance, living room with exit to a terrace with barbecue.
 
Smart control systems. Command through a touch screen in the unit, or from a cellphone anywhere in the world. Management of electrical functions inside the unit such as heating, alarm and closed circuit TV system, presence simulator, water heaters, etc.
 
Proa al Sur Building also has high end finishings. Floors in wood of lapacho in bedrooms and living room, frames of doors in polished lapacho, doors (of entrance and interiors) in polish solid cedar, with plated boards, bases in  petiribí polished in tone with the doors and the frames.

Terraced ceilings on hardwood façade finished with varnish, German Hansgrohe taps and Spanish Geneve, imported ceramics, Ferrum sanitary fixtures.

PROA AL SUR - Building Under Construction - Pocitos, Montevideo -PLAZA MAYOR Real Estate 

4 bedrooms USD730,000 Includes 3 garages and 1 box.-


 



RELATED PROJECTS

5
Punta Carretas, Montevideo

PRANA

Brand New

Incredible 11-level building: basement, ground floor, eight apartment levels and a last level of roof terrace and solarium for common use. I ... [more]

9
Punta Carretas, Montevideo

ALQUIMIA

In Construction

Entrepreneurship of hierarchy at the corner of September 21 and Williman. In this building you will find constructive and technological qual ... [more]

5
Punta Carretas, Montevideo

420 LAGUNILLAS

In Construction

420 Lagunillas is a functional project, with versatile plants designed for contemporary life, family life and the rhythm of urban life. The ... [more]

BUY SALE
DOLAR 41.4 43.9
EURO 48.5 52.5
REAL 6.7 8.4
PESO ARG. 0.15 0.45

Property Value Index (m2)

RECENT

PRANA

VIEW MORE

30 October 2020

ALQUIMIA

VIEW MORE

12 October 2020

MARINA 26 III

VIEW MORE

12 October 2020

Contact us for more information about this project

We will reply in no more than 24 hs.

ALL RIGHTS RESERVED PLAZA MAYOR ®