Project sheet

Launch

MET TRES CRUCES

Ref: 317

Launching!!! Studio USD 76,600



Exclusive launch located on Avenida 8 de Octubre in the heart of Montevideo, where the adrenaline of the city mixes with one of the most important green spaces in Montevideo: Parque Batlle

Tower of 15 floors with offices, monoambientes, 1 and 2 bedrooms with the best services, quality and modern comforts.

The basement of the building is defined by a significant colonnade that serves as the preamble to the imposing double height lobby with avant-garde design.

On the ground floor there is also a large commercial space and independent access to the office level, both with select finishing materials and refined details.

In the last level there is a room for events with barbecue for the exclusive use of the owners, crown the building with a double panoramic terrace and open views to the entire city of Montevideo.


Amenities:
Gym equipped.
High speed Wi fi in common areas.
Microcinema
Hall for events with barbecue on the top floor.
Terrace-garden and solarium with panoramic view.
Lobby with concierge and 24 hour security.
Electronic surveillance system.

Laundry in subsoil with last generation machines.
Three levels of parking.
Parking spaces for guests.
Bike racks for owners.
Solar panels and special energy saving systems

Delivery date October 2021


CHARACTERISTICS

Elevator
Barbecue
Heating
Complimentary parking
Surveillance
Solarium

ENVIRONMENTS

Kitchenette
Living room
Terrace

Floors

RELATED PROJECTS

NOSTRUM PLAZA BUILDING

Its design is capable of transforming the centric zone in the very center of your life

Brand New

ALTOS DE BULEVAR BUILDING

Near Tres Cruces Shopping and with all the benefits of the Promoted Homes

In Construction

VENTO TRES CRUCES

We invite you to live the Vento experience

In Construction

BUY SALE
DOLAR 36.35 38.35
EURO 39.65 43.65
REAL 8.7 9.7
PESO ARG. 0.4 0.9

Property Value Index (m2)

RECENT

GALA TREND

VIEW MORE

18 October 2019

IBIRAPUERA

VIEW MORE

17 October 2019

GREEN TOWER

VIEW MORE

16 October 2019

Contact us for more information about this project

We will reply in no more than 24 hs.

ALL RIGHTS RESERVED PLAZA MAYOR ®