Project sheet

In Construction

TORRE ARENAS BUILDING

Ref: 302

It is a remarkable emprendimiento located on the Rambla de Malvín. Enjoy the highest quality materials and details.



The Torre Arenas project will be located on Rambla O'Higgins No. 4741, corner of Av. 18 de Diciembre.

It will comprise the following types of apartments: 4 blocks with large units of 1, 2, and 3 bedrooms, as well as multipurpose mono-environments. All of them will form an outstanding complex that will culminate with an important façade facing the sea.

The entrance of the Arenas Tower will have a hall of great dimensions, standing out by a design of double height.
Large spaces will also be used for common areas and services, among which will be the gym and the laundry room.

In the 12th floor, the solarium, swimming pools and whirlpools will be built. Also, it will have two large rooms for events and open barbecue.

PRICES:
1 bedroom from USD 149,000
2 bedrooms from USD 300,000
3 bedrooms from USD 535,000

OPTIONAL GARAGES FROM: USD 25,000.

To the prices it is necessary to add a 4% in concept of connections, embedding, regulation and plans. These rise by floor and take as a base a first floor.

Types 12, 13, 14, 15, 16 and 17 go up: USD 2,000 per floor.
Types 02, 05, 06, 07, 09, 10 and 11 go up: USD 2,500 per floor.
The types 01, 03, 04 and 08 rise: USD 3,500 per floor.

Units that have a patio are not included in this list. Prices may change at any time, without prior notice.

Example of payment method:
Sign: 10%
Commitment: 20% (30 days after the sign)
40 monthly installments of 1.75% each.

Floors

RELATED PROJECTS

E-TOWER AVENUE

Italia Ave. and Concepción del Uruguay

Brand New

ISLA SOÑADA

Exclusive building on Malvin´s Rambla.

Brand New

GALA TREND

Apartments designed with the best distribution to live and enjoy

Brand New

BUY SALE
DOLAR 36.35 38.35
EURO 39.65 43.65
REAL 8.7 9.7
PESO ARG. 0.4 0.9

Property Value Index (m2)

RECENT

GALA TREND

VIEW MORE

18 October 2019

IBIRAPUERA

VIEW MORE

17 October 2019

GREEN TOWER

VIEW MORE

16 October 2019

Contact us for more information about this project

We will reply in no more than 24 hs.

ALL RIGHTS RESERVED PLAZA MAYOR ®